Reference project

HUNGRANA Kft. — CHP system installation

Integration of a Turbomach turbine-generator set and the associated heat recovery boiler into the investor's existing electrical, control, steam and gas systems.

Integration of a Turbomach turbine-generator set and the associated heat recovery boiler into the investor's existing electrical, control, steam and gas systems.

Preparation of permit and detailed designs based on the data of the equipment purchased by the investor, and permitting by the MMBH. Construction covered the architectural work; the gas system with a filter, up to the gas compressor supplied by the investor; the HRSG steam system connection; and the feedwater and condensate system. We also built the electrical connection, including a transformer installation, and integrated the plant into the investor's control system.

Client: Hungrana Kft.

About the facility:

Output of the installed turbine:

  • Electrical output: We = 15 MW
  • Thermal output: Wth = 28 MW