Delivery of a dedicated gas pipeline, a connecting pipeline and a pressure regulating station at a grain processing plant being built on the outskirts of Tiszapüspöki
Scope of supply:
All design required for the project (architectural, mechanical, electrical and control), and all construction work
Performance data:
Heat-Gázgép gas filtering, preheating and pressure regulating station (DN 80/100, PN 63)
Client: Tisza-TK Projekt Kft. Execution: 01/2016 – 04/2017


