Design and construction of a 1,000 m3 wood chip storage silo and boiler feeding system alongside an existing coal-fired boiler.
As general EPC contractor, we delivered the complete design, construction, installation and commissioning of the biomass receiving, storage and feeding system, covering:
Process design (P&ID)
Mechanical design
Control and power design
Fabrication, equipment supply and installation
Trial operation and commissioning
Training and as-built documentation
Client: ALPIQ Zlín power plant
About the facility:
Wood chips delivered by lorry are carried from the receiving station by a conveyor system to the 1,000 m3 storage silo. From the silo, a second conveyor system takes them to the fluidised bed boiler, where they are fed in by a screw feeder passing through the boiler wall. A rotary air lock prevents combustion air from flowing back. The system is designed for a feed capacity of 5 t/h.