Construction of a new water treatment plant producing demineralised and polished demineralised water using UP-CORE technology.
As general EPC contractor, our tasks included the complete design, permitting, construction, installation and commissioning of the new water treatment plant, covering:
- Process design (P&ID)
- Permitting by the authorities (building authority, MKEH)
- Mechanical, control and power design
- Fabrication, equipment supply and installation
- Trial operation and commissioning
- Training and as-built documentation
Client: Budapesti Erőmű
About the facility:
The new water treatment plant produces demineralised water from raw Danube water by lime pre-softening followed by cation-anion ion exchangers with a capacity of 3 × 70 t/h. Mixed-bed ion exchangers with a capacity of 2 × 70 t/h then deliver polished demineralised water (the demineralisation uses UPCORE technology).