Expansion of the existing Ózd heating plant with two new gas engine units. Construction, commissioning and handover of the two gas engine generator sets and their auxiliary systems, up to the connection points on the district heating trunk main and the receiving terminals linking the medium voltage switchgear to the ÉMÁSZ system.
Client: Sinergy Kft.
Main parameters of the combined heat and power plant:
- Electrical output: 4.86 MW
- Thermal output: 4.88 MW
Main equipment: gas engines (two units)
Supplier: GE Jenbacher AG
Type: JMS 616 GS-N.L.C
- Electrical output: 2.43 MW
- Thermal output: 2.44 MW
- Electrical efficiency: 40.9%
- Thermal efficiency: 43.1%
Electrical system (medium and low voltage)
Supplier: ABB