Construction of a combined heat and power plant supplying heat to the Tiszaújváros district heating system, as a greenfield project.
Kraftszer Kft.'s task was the turnkey delivery of the facility, including design, supply of all machinery and equipment, architectural, mechanical, electrical and control construction, and commissioning.
Main equipment
Main parameters of the plant:
Electrical output: 6.4 MW
Heat output: 42.2 MW
Two Wärtsilä gas engines:
Electrical output: 3.2 MW
Heat output: 3.4 MW
Electrical efficiency: 39.7%
Thermal efficiency: 42.2%
Three ALSTOM boilers:
Heat output: 16.0 MW
Thermal efficiency: 94.4%
CWG water treatment unit:
Capacity: 12.0 m3/h
The medium and low voltage switchgear is made by Siemens. The control system is based on Siemens Simatic.