Reference project

TVK combined-cycle power plant — yard piping system

Delivery of the systems serving the new combined-cycle power plant (design, construction, commissioning).

  • Delivery of the systems serving the new combined-cycle power plant (design, construction, commissioning).
  • Design, installation and commissioning of all yard piping systems:
  • Steam systems (high pressure, 42 and 16 bar)
  • Other utility systems (serving the gas and steam turbines)
  • Complete delivery of the oil supply, make-up, drain, blowdown and hot water systems
  • Mechanical, electrical and control design, construction and commissioning; design, fabrication and permitting of a 300 m3 oil tank.
  • Oil supply system from the oil pump house to the valve trains of the auxiliary boilers.
  • Supply, installation and erection of tanks, pumps, heat exchangers, valves, instruments and other equipment.
  • Start-up and commissioning of all systems.
  • Pressure tests by system and medium.
  • Construction of temporary installations, cleaning and blowing out. Supervision and operation during start-up, recording of IQ/OQ data sheets.

Investor: TVK Erőmű Kft.

Complete piping delivered for the following systems:

  • Gas turbine oil supply system
  • De-icing system
  • High pressure steam systems (16 bar and 42 bar)
  • Pressurisation system
  • Drain water system
  • Compressed air system
  • Closed cooling water system
  • Fuel supply systems (gas and oil)
  • Hot water system
  • Make-up water system
  • Blowdown water system

Request a quote

Planning an energy project?

Send us the scope or the drawings — we will review them and agree the next step with you: design, construction or full EPC.