Reconstruction of an existing district heating network using pre-insulated district heating pipes. Scope of supply: removal of the existing pipelines and installation of a new pre-insulated pipeline along the route of the removed pipes. A temporary network also had to be built for the duration of the works. Performance data: operating pressure: 16 bar; operating temperature: 150 ºC; pipeline length: 2 x 415 m; typical size: DN 250, DN 200; commissioning: on day 52; construction period: 90 days

Reference project
FŐTÁV Zrt — district heating renewal at Budafoki út and Bertalan Lajos utca, Budapest
Reconstruction of an existing district heating network using pre-insulated district heating pipes.
More projects

District heating trunk main in Apáczai Csere János utca
BKM Nonprofit Zrt. — FŐTÁV Távhőszolgáltatási Divízió
735 metres of DN 250/400 pre-insulated district heating trunk main in central Budapest, between Elisabeth Bridge and the Dorottya Hotel, as part of the city-centre air quality improvement programme.

District heating pipeline 21 metres underground — Vágóhíd utca to Orczy út
FŐTÁV Zrt.
Using trenchless technology, 21 metres underground, beneath a metro tunnel and tram tracks, we connected the district heating networks of Józsefváros and Ferencváros.

FŐTÁV Zrt — renewal of a district heating pipeline at Budafoki út, Budapest
Főtáv Zrt.
Renewal of the road-crossing section of an existing district heating trunk main.