Reference project

MOM Park — construction and operation of the energy centre and district heating system

Partial design, complete installation, commissioning and subsequent operation of the energy centre providing 6,000 kW of heating and 6,000 kW of cooling for the MOM Park complex, together with its cooling system and district heating system.

Partial design, complete installation, commissioning and subsequent operation of the energy centre providing 6,000 kW of heating and 6,000 kW of cooling for the MOM Park complex, together with its cooling system and district heating system.

Client: Sinergy Kft.

Piping and instrumentation diagram (P&ID), functional descriptions based on the P&ID for building the building management system, and detailed mechanical designs for the general designer's design. Main equipment: one Jenbacher J320 GS-N-LC gas engine module with 1.2 MWt thermal and 1 MWe electrical output; two Vasfa AKH-2900 M gas boilers of 3 MW each; three Carrier 19 XR 4545-385 CQH centrifugal chillers of 2 MW each; one Carrier 16 JB 047/068 absorption chiller of 0.7 MW; ten Baltimore VFL 964-PX cooling towers of 0.85 MW each; building management system; auxiliary equipment

Request a quote

Planning an energy project?

Send us the scope or the drawings — we will review them and agree the next step with you: design, construction or full EPC.